410
K
Gross floor area
22
storeys
Above grade
26
mo
Ground-break to handover
2
wk
Ahead of contract date
Project details
No.
06
Client
Northfield Group
Location
Columbus, OH
Sector
Industrial
Area
520,000 sq ft
Year
2023
Services
Pre-construction, General Contracting
Architect
Arca Industrial
A 520,000 sq ft cross-dock hub with 96 dock doors, delivered in 11 months from ground-break to first truck for a tenant with a fixed peak-season go-live.
The challenge
The tenant’s go-live was tied to its peak season, so the date was fixed before the design was complete. The 40-acre site had poor soils across most of its footprint.
A building this size usually takes longer than eleven months. Every week lost on the ground would have come straight out of the tenant’s fit-out time.
Our approach
Pre-construction started early with Arca Industrial and the tenant. We split the site into four zones so ground improvement, slab, walls and paving could move across it in parallel instead of in sequence.
Tilt-up wall panels cast on the slab in parallel with steel erection.
Ground improvement and paving sequenced in four zones across the 40-acre site.
Dock levelers and doors procured during pre-construction to remove the longest lead time.
Eleven months only works if nothing waits for anything else. We planned the site as four jobs running side by side.

Cranes on the steel frame at dusk, with zones two and three running in parallel.
The outcome
The first truck docked eleven months after ground-break, three weeks before the tenant’s peak season. All 96 doors were commissioned and tested before handover.
The project closed under budget, and Northfield has since appointed us for its second hub in the region.
Gallery
From the core
to the crown.
Progress photography from ground-break to handover, shot by our site team every Friday.





14 days
Ahead of contract handover
Client review
Eleven months, 96 doors, zero surprises.

Marcus Lee
Development Director, Northfield