Civic

Kova Arts Campus

A 140,000 sq ft arts campus with studios, a 600-seat theatre and a gallery wing, wrapped in a precast concrete skin.

Denver, CO

Completed

2024

Design–Build

410

K

Gross floor area

22

storeys

Above grade

26

mo

Ground-break to handover

2

wk

Ahead of contract date

Project details

No.

04

Client

Kova Foundation

Location

Denver, CO

Sector

Civic

Area

140,000 sq ft

Year

2024

Services

Design–Build

Architect

Ferro Lind

Studios, a 600-seat theatre and a gallery wing for the Kova Foundation, built inside a fixed donor budget with acoustic isolation that had to be right first time.

The challenge

A theatre needs a room that is silent when the city outside is not. Box-in-box acoustic construction is expensive and hard to fix once the finishes go on, and the budget was set by donors before design was complete.

The foundation also had a fixed opening season. Missing it would have meant a year without programming and without the ticket income the business plan depended on.

Our approach

As design–build lead we priced the acoustic strategy before design development ended, with Ferro Lind and the acoustic consultant at the same table. The building envelope moved to precast so it could be made indoors through the winter.

  • Box-in-box acoustic construction priced, mocked up and tested before the main package was let.

  • Precast concrete facade panels cast off site through the winter and lifted in over six weeks.

  • Theatre rigging and AV commissioned two months before opening, leaving time for rehearsals.

We treated acoustics and budget as one problem. Every decibel had a price, and the foundation could see both before they decided.

Tower cranes above the site at dusk

Cranes lifting precast panels onto the gallery wing at dusk.

The outcome

The campus opened for its first season in September 2024, within the design–build price. Acoustic testing in the theatre met the design target on the first run.

The precast envelope saved eleven weeks against an in-situ facade and kept the site dry for interior trades through the spring.

Gallery

From the core

to the crown.

Progress photography from ground-break to handover, shot by our site team every Friday.

14 days

Ahead of contract handover

Client review

They treated acoustics and budget as one problem, and solved both.

Mira Kovač

Director, Kova Foundation

Next project

Request an estimate

Have a project?

Let's build it.

Tell us about your site, timeline and budget. You'll get a clear, fixed estimate within 10 business days — no obligation.

We reply within one business day.

Built to last.

Planned from day one.

Booking projects for 2027

STRUKT

General contractor building commercial, residential and civic projects with fixed scope, fixed schedule and full accountability.

Office

1 First Avenue, New York, NY 10016, USA

+1 800 100 975 20

build@strukt.com

STRUKT

Built to last.

Planned from day one.

Booking projects for 2027

STRUKT

General contractor building commercial, residential and civic projects with fixed scope, fixed schedule and full accountability.

Office

1 First Avenue, New York, NY 10016, USA

+1 800 100 975 20

build@strukt.com

STRUKT

Built to last.

Planned from day one.

Booking projects for 2027

STRUKT

General contractor building commercial, residential and civic projects with fixed scope, fixed schedule and full accountability.

Office

1 First Avenue, New York, NY 10016, USA

+1 800 100 975 20

build@strukt.com

STRUKT

Create a free website with Framer, the website builder loved by startups, designers and agencies.