Residential

Villa Halden

A 9,800 sq ft waterfront villa with a 25-metre pool, built to hurricane code with floor-to-ceiling impact glazing.

Miami, FL

Completed

2023

General Contracting

410

K

Gross floor area

22

storeys

Above grade

26

mo

Ground-break to handover

2

wk

Ahead of contract date

Project details

No.

05

Client

Private client

Location

Miami, FL

Sector

Residential

Area

9,800 sq ft

Year

2023

Services

General Contracting

Architect

Halden & Co

A 9,800 sq ft waterfront villa built to hurricane code, with a 25-metre pool and floor-to-ceiling impact glazing, delivered through a full hurricane season.

The challenge

The site sits in a high-velocity hurricane zone, and the build window crossed the whole season. An open house in August is a risk to the structure, the materials and the people on site.

The design by Halden & Co called for large glazed openings and a pool set into the waterfront, both of which are slow to build and sensitive to weather.

Our approach

We planned the build around the weather. The sequence put everything that needed dry conditions ahead of August, and every phase had a written storm plan before work started.

  • Storm plans for every phase, with all materials and equipment secured within four hours of a warning.

  • Impact glazing installed early to dry in the house before the peak of the season.

  • Pool shell poured and cured ahead of the wet months, with drainage in before the first storm.

We built the schedule around the weather, not against it. Every phase had a plan for the day the warning came.

Crews tying steel for concrete columns

Column steel tied ahead of August, so the frame could close in before peak season.

The outcome

The villa was handed over in November 2023 without a single weather claim. Two named storms passed during the build; both were handled by the storm plan with no damage on site.

The owners took the keys on the agreed date and the house is covered by our two-year workmanship warranty.

Gallery

From the core

to the crown.

Progress photography from ground-break to handover, shot by our site team every Friday.

14 days

Ahead of contract handover

Client review

Calm, precise and on time, through a full hurricane season.

Private client

Owner, Villa Halden

Request an estimate

Have a project?

Let's build it.

Tell us about your site, timeline and budget. You'll get a clear, fixed estimate within 10 business days — no obligation.

We reply within one business day.

Built to last.

Planned from day one.

Booking projects for 2027

STRUKT

General contractor building commercial, residential and civic projects with fixed scope, fixed schedule and full accountability.

Office

1 First Avenue, New York, NY 10016, USA

+1 800 100 975 20

build@strukt.com

STRUKT

Built to last.

Planned from day one.

Booking projects for 2027

STRUKT

General contractor building commercial, residential and civic projects with fixed scope, fixed schedule and full accountability.

Office

1 First Avenue, New York, NY 10016, USA

+1 800 100 975 20

build@strukt.com

STRUKT

Built to last.

Planned from day one.

Booking projects for 2027

STRUKT

General contractor building commercial, residential and civic projects with fixed scope, fixed schedule and full accountability.

Office

1 First Avenue, New York, NY 10016, USA

+1 800 100 975 20

build@strukt.com

STRUKT

Create a free website with Framer, the website builder loved by startups, designers and agencies.